The queue shipped with no tests despite having produced four bugs during development, which is the wrong order. 21 tests now cover the parts whose failure modes are not obvious from reading the code: ordering by priority then FIFO, that depth is genuinely unbounded and survives a restart, that running work is never cancelled, that a job abandoned mid-run is requeued rather than left RUNNING forever, and that an LLM job's VRAM requirement comes from its own model rather than a tenant-wide figure -- the mistake that dispatched a 14.9 GB model into 8 GB of free memory and killed llama-server three times. The dashboard had no view of the queue at all, so a stuck queue was indistinguishable from an empty one. The Job Queue panel shows what is running and what it released to get there, pending jobs in execution order with their wait time and a cancel control, and -- when the scheduler is blocked -- how long it has been waiting and why. MCP gains queue_job, get_job_queue and cancel_job, so an agent can line work up rather than firing a request and hoping the GPU is free. Tests: 271. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
56 KiB
56 KiB