Detailed wiki content repair: Home
51
Home.md
51
Home.md
@@ -0,0 +1,51 @@
|
||||
# gitea-stewardship-ledger
|
||||
|
||||
## Purpose
|
||||
|
||||
- Gitea account: drjones
|
||||
- Gitea host: https://gitea.thetempleofdoom.com
|
||||
- Local workspace: /Volumes/sanD/dev_shit
|
||||
- Public repos found through Gitea API: 32
|
||||
- Additional private repos found through MCP / created this pass: my-loves-calendar, c5-jacked, plus 26 local-only project placeholders created in the second pass.
|
||||
- Top-level local folders inspected: 44
|
||||
- Top-level local folders with README after this pass: 44
|
||||
|
||||
## Current Classification
|
||||
|
||||
- Software / documentation workspace
|
||||
- Private repository
|
||||
- Default branch: `main`
|
||||
- Primary reported language: `Markdown`
|
||||
|
||||
## Evidence Reviewed
|
||||
|
||||
- Gitea description: Operational ledger for Gitea repository stewardship and import decisions
|
||||
- Default branch: main
|
||||
- Detected language: Markdown
|
||||
- Visibility: Private
|
||||
- Topics: private-workspace, readiness, software, stewarded
|
||||
- No mapped local source directory was found; details are based on the Gitea tree.
|
||||
- Visible project files beyond stewardship docs: 0
|
||||
|
||||
## README Headings Found
|
||||
|
||||
- Gitea Stewardship Ledger
|
||||
- Stewardship Status
|
||||
- Completed This Pass
|
||||
- Push Pass: 2026-05-20
|
||||
- Push Cleanup Decisions
|
||||
- Embedded Git Checkouts
|
||||
- Empty Gitea Repos Initialized
|
||||
- Private Placeholder Created
|
||||
- Private Placeholders Created In Second Pass
|
||||
- Declined Repo Creation
|
||||
- Duplicate Candidates
|
||||
- Local Project Remote Classes
|
||||
|
||||
## Current State
|
||||
|
||||
- No non-stewardship source files are visible yet; this repo may still be a placeholder or import shell.
|
||||
|
||||
## Keeper Decision
|
||||
|
||||
This wiki page is based on the repository tree and mapped local project files inspected on 2026-05-20. Replace inferred notes with verified project facts as the readiness checklist is completed.
|
||||
|
||||
Reference in New Issue
Block a user